NEWS FROM THE CONSTRUCTION SITE
Information about the construction of the Danubia Residence residential complex
Danubia Residence is now officially in operation
We are pleased to announce that Danubia Residence has been officially commissioned.
This is a major milestone for the project — the first residents have already moved in, bringing life and warmth to the building.
We are proud to have created a modern and comfortable space where people truly want to live.
Danubia Residence — your new home in the heart of Komárno.
Danubia Residence entrances are now numbered
Danubia Residence had already been assigned its official address, and now each entrance has received its unique number.
This is an important step in the formalization process, bringing us closer to the handover and welcoming future residents.
We continue moving forward, creating a comfortable and well-organized living space.
The perimeter of Danubia Residence is now secured
At Danubia Residence, we focus on both security and aesthetics.
The perimeter of the complex is now fully enclosed with a stylish fence, designed to complement the terrace railings.
This addition creates a cohesive, contemporary look and offers even greater comfort and privacy for our residents.
Danubia Residence — a place where every detail matters.
10.09.2024
Laying laminate flooring
We have moved on to the stage of laying class 33 moisture-resistant laminate flooring in buyers ' apartments.
20.08.2024
Apartment repairs
We are moving on to a new stage of work, the active phase of repairs in apartments.
Danubia Residence elevators get a new look
At Danubia Residence, we continue to refine every detail to meet the highest standards of comfort and aesthetics.
We have completed the cladding of our elevators with natural graphite-colored tiles. This updated look highlights the contemporary style of the complex and creates a welcoming atmosphere from the moment you step inside.
This upgrade is part of our ongoing vision: to create a space that truly feels like home.
20.06.2024
We have completed another stage of work
And we took a drone survey of the territory of a residential complex and infrastructure.
10.06.2024
New report
We received tiles for the improvement of public areas and immediately started working.
21.05.2024
New report
Landings from a drone in the residential complex Danubia Residence
08.04.2024
Active phase of work
Laying of electrical networks, installation of underfloor heating systems, installation of intercoms.
10.03.2024
Elevators are installed
Elevators have been installed and floor screed and wall painting works have been completed in the common corridors, as well as the installation of lighting devices continues.
03.03.2024
New report
The territory around the residential complex is being transformed every day, and the eyes are happy. We are getting closer to this 3D visualization. Tile laying, drainage, territory lighting.
25.01.2024
Landscaping works
New report from the construction site. Drainage pipe installation and landscaping are carried out in accordance with the latest standards. Work is actively carried out, which contributes to the rapid growth of the new building.
20.01.2024
We started landscaping
We share with you the latest news from the construction site of the Danubia Residence complex. A new stage in the construction of the house is the improvement of the territory and preparation of the site for Parking.
16.11.2023
What's on the construction site today
Bright facades of buildings made in warm tones with white architectural elements, which creates a sense of comfort and elegance.
11.11.2023
Finishing works
Facade works of the main building of the complex.
23.05.2023
Completion of 4 floors
Building a new level of ceramic blocks-the best building material for today.
10.06.2022
Completed 3 levels of masonry
The house is growing every day and getting better.
04.05.2020
Start of construction of the Danubia Residence residential complex